The drywall is almost done too. They just need to sand and prime and then we can start finish work. Huge change to the look and feel of the house all around.
On to house #3! The new challenge: take a 1940, 2700 sq. ft. two-story federal style house in Arlington, VA and turn it into a 4600 sq. ft. house with a modern twist. Back to construction zone living!
House
Wednesday, July 29, 2015
Exterior painting
Our painters showed up this morning to start on the exterior. By this afternoon our curb appeal should be much better. We went with Brush Blue by Benjamin Moore for the lap siding. Custom matched the grey metal roof color for the shingle siding and bright white for the trim.
Thursday, July 23, 2015
Drywall starting
Next big step is here! Drywall material is delivered and a crew will be coming bright and early in the morning to start hanging. Hopefully in a few weeks we will be ready for finish work. We also installed Roxul soundproofing insulation in the interior walls of the master bedroom for privacy and to help with the street noise.
Friday, July 10, 2015
Sealing up the house
![]() |
| Getting started - two windows in need of bricking |
![]() |
| One down! |
![]() |
| Second window in progress |
![]() |
| Halfway there... |
![]() |
| So close |
![]() |
| And done! Ready for exterior paint! |
![]() |
| Getting started with the spray foam |
![]() |
| Working their way up the walls |
![]() |
| One wall all sealed up |
![]() |
| More walls all sealed |
![]() |
| Moving through the house |
![]() |
| Exterior block walls done - onto the exterior wood framed walls, with cellulose, next! |
Monday, June 8, 2015
Weekend Blitz
We've had a bit of a pause around here while we sort out a subcontractor issue (which, of course, just reaffirms our general desire to DIY all of the things) but we got back on track this weekend with a long day of work on Saturday. Our new sub and his guys put in a 12+ hour day to run all of our ducts on the second floor and install a new a/c unit for our basement (which will eventually serve the first floor too). Since a heat wave is about to hit mid-week, we are extremely grateful that they got all the work done now! We are also very nearly finished with running the PEX plumbing to the first and second floors and we tested the lines we have in - with just one small spill caused by an open tub valve. But that was easily remedied and all the other lines appear to be holding pressure just fine. And we've been continuing to work on little odds and ends, like installing a window well for one of the basement windows. It still feels like a long haul to get to drywall but we're making progress!
![]() |
| Digging out the window well |
![]() |
| Much better! |
![]() |
| Just a little more grading to go |
![]() |
| Someday (soon), these ducts will be keeping our house warm or cool |
![]() |
| More ductwork |
![]() |
| Big house = even more ductwork |
![]() |
| Many connections to get to the mini-manifolds - all shutoffs are installed and working! |
![]() |
| Slowly, the main manifold is filling up with lines |
Saturday, May 30, 2015
Inside again
| Getting the main manifold set up |
| Starting to run some initial lines |
| Copper mini-manifolds in place |
| Initial view of the shower space (the black plastic over the windows and on the walls is to protect the PEX piping from direct UV rays) |
| Here's the floor area, already prepped with self-leveler |
| Mortar to hold the pan in place |
| And the pan is in, weighted down with whatever we had handy to help it set |
Monday, May 4, 2015
Inside and Out
| Siding on! Paint to come |
| Side view |
| Old door |
| No door |
| Cutting back the brick an inch or so to fit the new door |
| And in! Just need foam and trim. |
| Garage underway |
| Wrapped but no siding yet |
| We'll probably swap out the garage door but looking much nicer now! |
| Fireplace with old stone facade removed and starting to build it out again |
| More progress |
| Ready for new stone now |
| Sketching out the stairs but not safe for walking yet |
| View from the second floor |
| Starting to come together |
| Not quite ready for walking just yet but getting there! |
Friday, April 3, 2015
The Cat is Back!
With apologies to my furry friends, we have a new cat in the family and it is the best one yet! About a year and a half ago, we said goodbye to our beloved bobcat after we finished the landscaping on the other house. That was a great machine and we could not have done our driveway, patio, landscaping, etc. without it. But, it was also a bit small by bobcat standards. Now, with a bigger house, bigger yard, and a new landscaping project on hand, we decided it was time to get a bigger bobcat too! We are now the proud owners of a 1998 863 bobcat with a smooth bucket and pallet forks. Here it is, the newest member of the family...
On other news, we keep moving along on the house too. The back is just about finished with siding and trim now and they'll be moving onto the sides and finishing the front next.
| Hello new friend! |
| We have plenty of work for you here! |
![]() |
| For comparison, here's the old one - a great machine but much smaller |
| Making progress |