On to house #3! The new challenge: take a 1940, 2700 sq. ft. two-story federal style house in Arlington, VA and turn it into a 4600 sq. ft. house with a modern twist. Back to construction zone living!
House
Saturday, January 21, 2012
29 down, 65 to go
So far we have laid about 650 sq ft of hardwood flooring or 29 boxes worth. The master bedroom and closets are finished. We are about a third of the way through. Our interior doors are ordered so those should be here in a couple weeks. Next up is to plan out our closets and get those installed. Then trim and more paint and we will be ready to move upstairs.
Monday, January 16, 2012
Long weekend, little work
Despite the long weekend we didn't get much done work-wise. We did, however, get closer to picking out tile for the master bath. Right now it's probably going to be a gray floor with some sort of brown on the wall. Neutral, but with a little bit of style. The cabinets are the same color as the kitchen so hopefully everything will look good. We also picked out a countertop for the guest bath and hung a light fixture in there. There's still a lot of trim left in the master bedroom so we will move on that this week and get back to installing the bamboo.
Thursday, January 12, 2012
Newest seat in the house
Another couple of nights this week and all of a sudden we have another (almost) full bath. We still need to pick out a countertop and hang a door, but the shower and toilet is fully functional.
Exciting times over here... Seriously.
Monday, January 9, 2012
Monday Fun-day
I was feeling ambitious after work today so I decided to plug away at the remaining details in the guest bath. The painting is now done and the fixtures are installed. Technically we now have a fully functional 2nd bath and shower! There's still some caulking to do around the edges, but so far no leaks and great pressure. The PEX plumbing system we installed is great so far. It only took about 15 seconds for the hot water to reach the fixture. Our water heater is in the basement so that's pretty fast. I still need to cut in the cabinets and do some trim so we can install the toilet. It was a late night, but after the paint fumes and silicone caulk fumes, I won't be needing a glass of wine to relax...
Sunday, January 8, 2012
A few steps closer
We finished up the tile in the guest bath and got everything grouted. The tile design we picked turned out great. There were a few cracks to fix on the walls so we didn't get around to painting yet. Luckily we were able to borrow our friend Audra's car so we could get a few of the large supplies we need for upcoming projects - new basement door, toilets, and a bunch of trim. Thanks Audra!! I also did a little bit of detail work upstairs too - hung some lights and finished some electrical switches/outlets mostly. The small work seems to pile up pretty quick, but I don't like to spend an entire weekend doing that stuff as it gets tedious fast. Much more fun to do some of the bigger projects like tiling or flooring and only spend a couple hours a day on the punch list stuff.
Monday, January 2, 2012
First of the tile finished
We finished up the guest bath tile today. The shower is ready for grout and then I can install the fixtures and we can start using it. Next weekend we will pick up a toilet/paint/light and finish this bathroom up. The laundry room is ready for grout too so hopefully I can install the electrical in there and we can start using our new washer/dryer as well. Lots of progress!
Sunday, January 1, 2012
New year, same work
We rang in the new year getting a little closer to a finished bathroom. We were on vacation this past week so we got a needed break from the renovations. Now we can get back to work with a renewed energy. First up is to finish the upstairs guest bath. The pattern and the size of the tiles is a bit of a pain, but it's turning out great. There wasn't enough mortar in the bucket to finish the side walls so we started the laundry room floor with the leftovers. Hopefully the walls will be tiled tomorrow and we can get the floor done and the grout done this coming week. Then just add a few details... toilet, vanity, light, trim, paint... OK maybe not so few, but the hard part is behind us. The rest should be relatively easy as the prep work is already done.