The master bathroom is very nearly finished and, because I couldn't wait, I've already taken a bath and can therefore definitively say that this bathroom is my favorite of all we've built to date. We still need to have the shower glass and vanity top installed, but it's very close to being complete. So, on to the pictures!
|
First, some plumbing to adjust the fixtures |
|
Getting the shower fixtures into place - I'm not sure why the shower tile looks so dark here since, as the picture below shows, the tile is more of a medium gray |
|
This is a better representation of the color scheme and shows the double shower |
|
Getting ready to install the tub - with shades installed and walls painted (in a Behr color called "Fast as the Wind") |
|
Very large soaking tub, ready for install |
|
And, with help from our friend Malia, tub installed! |
|
Installing the 7' vanity |
|
Getting everything level |
|
And now ready for countertops! |
No comments:
Post a Comment