House

House

Wednesday, April 6, 2011

Interior framing

To the left is the 2nd bathroom, straight ahead is one of the bedrooms, the hallway is to the left of the stairs
Another view of the bedroom
Looking into the 2nd bathroom where the wall is on the ground, far right is the other bedroom. I was thinking about taking the hallway wall down and maybe doing a railing instead.
view into the other bedroom
They're about halfway done with the 2nd floor interior framing. All the rooms and closets are just what I was picturing in my head. So far both bedrooms and closets are framed and both are nicely sized. Roofing should start tomorrow and the front porch on Friday.

No comments:

Post a Comment