The rear wall was partially taken out in preparation of a new load bearing beam so we can open up the space for the new kitchen and dining room. Also demolished was the back walkout steps and wall. They need to be moved 2 feet and the retaining walls need to be rebuilt to support the roof load of the new addition.
No comments:
Post a Comment