On to house #3! The new challenge: take a 1940, 2700 sq. ft. two-story federal style house in Arlington, VA and turn it into a 4600 sq. ft. house with a modern twist. Back to construction zone living!
House
Monday, August 15, 2011
It ain't over til it's over
A few weeks ago, we posted about running Pex for the two bathrooms upstairs. Words like "quick" and "easy" may have been thrown around and we thought we were just about finished with the plumbing. It turns out we were overly optimistic! On Sunday, we tackled adding the valves for the tub and the showers. We have a double shower in the master bath so we had to install a total of three shower valves, plus the tub valve, and it took much more time than expected to figure out where and how to install each valve. After a long day, though, we now have all four valves installed and we're that much closer to being ready for inspections...though just in case something else comes up, I'm not going to say it's finished, having learned that lesson once already...
Saturday, August 13, 2011
And now...
Tuesday, August 9, 2011
Big delivery
Lots of goodies came via freight today. All our bathroom fixtures and our master bathtub showed up. Now I have to hit Home Depot for all the fittings I need and mount up the faucet valves for everything. Most of the other work is complete - electrical is run, plumbing and hvac are done. Just a few finishing touches and we should be ready for inspection soon.
Friday, August 5, 2011
Shopping Spree
Sunday, July 24, 2011
PEX rough-in complete
We also started the lower level HVAC. We only have 4 vents to put in so it shouldn't be too hard. There's still a page long list of odds and ends that need to be completed, but hopefully in another week (or maybe two) all our rough-ins will be complete and we can call for an inspection. We'll be just a few weeks shy of 6 months from the time we got our building permits. The project is moving along a bit faster than I thought it would.
Saturday, July 23, 2011
Another ceiling down
What do you do on one of the hottest days of the summer? If you're us, you spend the afternoon in the non-air conditioned part of the house taking down a plaster and metal lath ceiling. It's hot and dusty work on a good day and this was not a good day for such a project! But it's done now and will allow us to run the last of the water lines through the ceiling joists and up to the new laundry room on the second floor. For now, though, we're taking the evening off and using a gift certificate from Brian's parents (thanks, Joan and Jeff!) to go out to dinner...and we'll be staying inside in air conditioning for the rest of the evening.
Thursday, July 21, 2011
Rough in work... Still
Here are some quick pictures of how to connect the PEX fittings. First you cut the tubing to length. Then you put one of the crimp rings on and slide the tube onto the fitting. Last step is to use the crimper to permanently attach the tube to the fitting. Easy and leak free. It took me about and hour to run the lines and crimp everything.