Drains and electrical rough in

Carroll and Sons finished up the drain/waste/vent rough in and I started running cables. Two guys ran all the pipes in two days.
So far I have two circuits completely wired. To make myself feel better about how much time it took, I will say they were the most complex of the circuits I have to install. A bunch of 3 way switches and all the lights are spread out on the ceiling.