29 down, 65 to go

So far we have laid about 650 sq ft of hardwood flooring or 29 boxes worth. The master bedroom and closets are finished. We are about a third of the way through. Our interior doors are ordered so those should be here in a couple weeks. Next up is to plan out our closets and get those installed. Then trim and more paint and we will be ready to move upstairs.