On to house #3! The new challenge: take a 1940, 2700 sq. ft. two-story federal style house in Arlington, VA and turn it into a 4600 sq. ft. house with a modern twist. Back to construction zone living!
House
Saturday, October 29, 2011
Kitchen taking shape
First two cabinets are on the wall. Tomorrow we should have the other wall cabinet set and the island built. There's a big pantry at one end so that may require some help to hold everything together while it's built in place, but everything is progressing nicely.
Thursday, October 27, 2011
Looks can be deceiving
The cardboard boxes laying all over our kitchen floor may not look like much but someday soon, they will be our kitchen cabinets! They arrived yesterday and we've started putting them together. Cabinet assembly was billed as an easy DIY but it's not quite as simple as advertised. It's a little tricky to get everything lined up just right and we've been using the brad nailer, the 18 gauge nailer, and a lot of wood glue to make sure they stay together! We'll start the install this weekend and I can't wait to see how it all comes together.
Monday, October 24, 2011
One square foot at a time
We spent the weekend painting the second floor and continuing to work on the kitchen. Our cabinets should be arriving this week so we tore up more of the old floor and continued to lay down the new bamboo flooring. We now have enough down that we should be able to install all the cabinets - after they arrive and we assemble them, that is. We also spent some time looking at countertops so we'll be ready to order as soon as the cabinets are installed. We just might have a working kitchen in time for Thanksgiving!
Monday, October 17, 2011
It's starting to take shape
It was another busy weekend as we finished installing the hardwood flooring in the kitchen and dining room, installed the stove and hood, took delivery of our new refrigerator, dishwasher, washer and dryer, sold our old stove on Craigslist, and finished the insulation in the crawlspace. A lot of work but we're checking things off the list and starting to see how the kitchen space will shape up! We also finalized our cabinet order and will place that this week so we should have cabinets in a week or two to install. In the meantime, we'll probably switch back to working on the bedrooms, which need paint and flooring, so stay tuned...
Friday, October 14, 2011
Progress
The single appliance looks a little lonely right now, but tomorrow we're getting some more delivered and then we should be ready for cabinets. Here's to a new kitchen soon!
Thursday, October 13, 2011
The cat approves
Wednesday, October 12, 2011
Is that straight?
My cell phone camera has been taking awful pics lately, but you get a general idea of the color. The stranded bamboo has a lot of variation in color, but mostly it's a light honey color. It should go well with the dark wood cabinets.
Big shout out to the Powernail model 50P 18 gauge pneumatic nailer. After researching the stranded bamboo online I was a little worried it would split when nailed, but so far its going in nicely.